(EPC Project RDMP Balikpapan JO) - Job Vacancies Opportunities
Dear All,
We're still OPEN POSITION for:
-Schedule Engineer (Project Control)
-HVAC & Fire Fighting Engineer (Construction)
-Pre-commissioning Engineer (Instrument)
-Pre-commissioning Technician (Instrument)
-Instrument Designer (Field Engineer)
-Instrument Engineer (Field Engineer)
-Overhead Crane Operator
-Piping Engineer (Construction)
-Piping Supervisor (Construction)
-Painting Insulation Supervisor
-Pre-commissioning Engineer (Electrical)
-Electrical Supervisor
-Electrical Foreman
-Electrical Technician
-Steel Structure Fitter
-Fitter Pre- Commissioning (Skill 1 & 2)
-Scaffolder
-Pre-Commissioning Millwright (System Completion)
-Pre-Commissioning Foreman (System Completion)
-QC Piping Inspector
-QC E&I Engineer
-QC E/I (EX) Inspector
-Electrical Inspector (HSE)
-Scaffolding Inspector (HSE)
-Security JO Patrol (HSE)
Qualifications:
-Willing to be place as local hire (without housing, ticketing, and rooster schedule)
If you are interested or have recommendations for this position, please send the CV through email on recruitment@rdmpbpnjo.co.id or Click Here
(Only shortlisted candidate will be contacted)

%20-HVAC%20&%20Fire%20Fighting%20Engineer%20(Construction)%20-Pre-commissioning%20Engineer%20(Instrument)%20-Pre-commissioning%20Technician%20(Instrument).png)
%20(2).jpg)
%20(2).jpg)
0 Comments