𝐖𝐞 𝐥𝐨𝐨𝐤 𝐟𝐨𝐫𝐰𝐚𝐫𝐝 𝐭𝐨 𝐫𝐞𝐜𝐫𝐮𝐢𝐭𝐢𝐧𝐠 𝐛𝐫𝐢𝐠𝐡𝐭 𝐭𝐚𝐥𝐞𝐧𝐭𝐬 𝐰𝐢𝐭𝐡 𝐞𝐱𝐭𝐞𝐧𝐬𝐢𝐯𝐞 𝐞𝐱𝐩𝐞𝐫𝐢𝐞𝐧𝐜𝐞 𝐢𝐧 𝐨𝐢𝐥 & 𝐠𝐚𝐬 𝐨𝐟𝐟𝐬𝐡𝐨𝐫𝐞 𝐜𝐨𝐧𝐬𝐭𝐫𝐮𝐜𝐭𝐢𝐨𝐧 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬 𝐟𝐨𝐫 𝐭𝐡𝐞 𝐟𝐨𝐥𝐥𝐨𝐰𝐢𝐧𝐠 𝐯𝐚𝐜𝐚𝐧𝐜𝐢𝐞𝐬:
Projects Management• Project Managers
• Project Controls Managers
• Contract Admin Managers
• Planning Engineers
• Project Cost Control Engineers
Procurement
• Sr. Inspection Engineers
• Project Expeditors
• Procurement Engineers
Fabrication Yard
• Construction Manager
• Sr. / Yards engineer (Mech, E&I)
• Superintendent
• General Foreman
• Project Engineering Manager
Engineering
- Lead Engineers Mechanical,
- Lead Engineers E&I
- Lead Engineers Process & Safety
- Lead Engineers Structural
- Lead Engineers Piping)
- Engineers Mechanical,
- Engineers E&I
- Engineers Process & Safety
- Engineers Structural
- Engineers Piping)
- Senior Engineers Mechanical
- Senior Engineers E&I
- Senior Engineers Process & Safety
- Senior Engineers Structural
- Senior Engineers Piping)
• Offshore Construction Manager
• Offshore Construction Engineers
• Barge Superintendent/Foreman
• Anchor Foreman
QHSE
• Project HSE Manager
• Project Quality Manager
• Environment Engineer
𝐆𝐞𝐧𝐞𝐫𝐚𝐥 𝐑𝐞𝐪𝐮𝐢𝐫𝐞𝐦𝐞𝐧𝐭𝐬:-
• Bachelor’s Degree in Engineering is a must for all Managers and Engineers roles.
• Diploma in Engineering is required for Superintendents, Foreman except for Barge & Anchor Supt.
• For Managers – should have at least 15+ years in the relevant to oil and gas EPC Industry with proven management experience and sound technical knowledge.
• For Engineers/ Senior/Lead Engineers - from 5 to 15 years’ experience and having solid exposure the relevant disciplines and in various O&G construction projects.
• For Offshore Positions: Candidates should have sound knowledge with installation of platforms (jackets/decks), pipelines and other subsea works.
• For Yard positions: Candidates should have sound knowledge and experience in their relevant fields (E&I, fabrication, welding, scaffolding and painting).
𝐁𝐞 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐭𝐡𝐞 𝐧𝐞𝐱𝐭 𝐩𝐡𝐚𝐬𝐞 𝐨𝐟 𝐠𝐫𝐨𝐰𝐭𝐡 𝐚𝐧𝐝 𝐬𝐞𝐧𝐝 𝐲𝐨𝐮𝐫 𝐮𝐩𝐝𝐚𝐭𝐞𝐝 𝐂𝐕 𝐭𝐨 (𝐫𝐞𝐜𝐫𝐮𝐢𝐭𝐦𝐞𝐧𝐭@𝐧𝐩𝐜𝐜.𝐚𝐞)


%20(2).jpg)
%20(2).jpg)
0 Comments